Priority grouping rules help you to configure the priority of studies based on demographic data other than Priority ID. Use the Priority Grouping Editor to create new priority grouping rules.
![]() | Note: When priority grouping rules are created, they are available to be used in all worklists for all users. |
To add a new priority grouping rule
In the List area, click Worklists.
In the Worklist Library, under the appropriate type of worklist, click New.
or
Right-click an existing worklist and select Edit.
Switch to the Priority Grouping Rules tab.
Click Edit Rules.
In the Priority Grouping Rule Editor, click New.
In the Name field, type a name that describes the purpose of the priority grouping rule.
In the Description field, type a full description of the purpose of the priority grouping rule.
To set the color of the text for studies matching the priority grouping rule, click Text Color.
Select a color from the Color Palette. Click OK.
To set the color of the background for studies matching the priority grouping rule, click Background Color.
Select a color from the Color Palette. Click OK.
In the Criteria panel, from the Search for list, select Studies.
From the Add Criteria list, select the criteria for the priority grouping rule.
If adding criteria based on favorites, another administrator user must save the rule so it is added as a favorite before it can be used because favorites are associated with the individual user. Once saved, the rule works correctly. Non-administrator users can use the rules immediately because they do not edit the rule; therefore, the rule does not need to be added to their favorites.
Refine the expression by adding and removing criteria to get the appropriate results.
Type or select the values for each criteria.
When complete, click Save Rule.
The priority grouping rule is displayed in the Rules list on the left-side of the Priority Grouping Rule Editor.
To close the Priority Grouping Rule Editor, click Close.
Required permissions
General: Worklists > Configure Global Priority Groups operation
One of the following:
General: Worklists > Personal Worklists operation
General: Worklists > Scheduled Worklists > Create Scheduled Worklists operation
General: Worklists > Scheduled Worklists > Edit Scheduled Worklists operation
General: Worklists > Standard Worklists > Create Worklists operation
General: Worklists > Standard Worklists > Edit Worklists operation
Topic number: 97959 Applies to: IMPAX 6.5.1 Client Knowledge Base |