IMPAX 6.5.1 Client Knowledge Base: Extended > Dictating and reviewing reports > Dictating reports with IMPAX Reporting > Signing off and working with reports in IMPAX Reporting
Sign off a report when you are finished reporting and do not need to suspend reporting or submit the report for correction. Signing off a report validates the report and sets the corresponding IMPAX study status to Approved.
![]() | Note: Depending on the configuration of IMPAX Reporting, you may have both a Partial Validation |
To sign off multiple reports with IMPAX Reporting
Construct a sign-off worklist in the List area.
One or more reports can be selected in the worklist.
To cycle the selected reports, click Cycle. 
The Text area opens, showing the first report in the selection.
If after reviewing the report, you want changes made to it, you can send the report back to the author for further revision.
To sign the current report and advance to the next report, if configured for only a single sign-off button, click Sign. ![]()
or
If configured for two sign-off buttons, click Partial Validation
and then click Full Validation
.
To skip the current report and advance to the next report, click Next.
After all reports have been signed and/or skipped, you are automatically returned to the List area.
Required permissions
Study-based: Dictate Studies as Radiologist or Dictate Studies as Resident operation
See also
Sending a report back to the author with IMPAX Reporting
Signing off a single report with IMPAX Reporting
Topic number: 50596 Applies to: IMPAX 6.5.1 Client Knowledge Base |